+2 (02) 330 417 02

6th of October City Water Reservoir

  • Responsible Authority:National Organization for Potable Water and Sanitary Drainage
  • Location:El Wadi El Gedeed Governorate
  • Total Quantities of Completed Works:
    • Earthwork: Backfill 277,372 m3 - Excavation 269,099 m3 - Embankments 230,444 m3
    • Concreting: Plain Concrete 3,908 m3 - Reinforced Concrete 4,777 m3

EAC undertook the construction of an integrated sanitary drainage system comprising the following:

Sewage Treatment Plant
  • Comprises Entrances and Screens, with all the necessary Gates, Valves, Pipelines.
  • Chlorination Tanks
  • Ponds: which includes 16,900 m2 stone pitching, 185,634 m2 PVC lining, 230,444 m3 Embankments
Irrigation Channel
Construct a R.C. irrigation channel with a length of 1 Km, height 1.8 m, width 1.2 m, concrete thickness 0.3 m, to serve 2500 acres first stage, to grow agricultural tree plants and ornamental plants.
Ancillary Service Building
  • Administrative Building
  • Warehouse
  • Transformer
  • Generator
  • Security Building
  • Parking sheds