El Maadi Footpath
- Owner:Roads & Transport Directorate Cairo Governorate
- Location:El Maadi District
Under this contract EAC Constructed one tunnel of 30 m length and 2.9 m diameter using bolted segment tunneling system under Maadi Metro to be used as a pedestrian footpath. The works included all pertaining works of construction of entrance and exit, installation of lighting, ventilation ducts, ceramic tiling and all finishing works.